| NO. |
PROJECT |
CUST.
/ CLIENT |
QUANITY |
WORK
DETAIL |
| 1 |
HK Airport
- Chek Lap Kok Airport |
HK Airport
Authority |
260,000 meter
run |
Airport Taxiway
Surface Repair |
| 2 |
Chai Wan
Park |
ASD |
600 m2 |
Anti-Slip
Coating System |
| 3 |
Fortress
Hill Road |
Highways
Department |
600 m2 |
Anti-Slip
Coating System |
| 4 |
KMB Bus Depot
at Tai Po |
KMB |
1,000 m2 |
Anti-Slip
Coating System |
| 5 |
Po Lam North
Road |
Highways
Department |
1,000 m2 |
Anti-Slip
Coating System |
| 6 |
Radar Station
at Parkers Mount |
ASD |
1,200 m2 |
Anti-Slip
Coating System |
| 7 |
HK Disney
Land |
Shui Wing |
1,200 m2 |
Car Park
Floor Hardener |
| 8 |
Tuen Mun
4C Housing Development |
Housing Society |
8,000 m2 |
Car Park
Floor Hardener |
| 9 |
HK Cyber
Port, Phase 3 & 4 |
Hsin Chong |
50,000 m2 |
Car Park
Flooring |
| 10 |
Flyover Concrete
Protective Coating |
Highway Dept |
60000 m2 |
Dekguard
S Coating for Concrete Surface |
| 11 |
Flyover Protective
Coating |
Highway Dept/
Chiu Hing |
150000 m2 |
Dekguard
S Coating for Concrete Surface |
| 12 |
Protective
Coating for H107 Flyover |
Highways
Department |
1,600 m2 |
Dekguard
S Coating for Concrete Surface |
| 13 |
Protective
Coating for H116 Flyover |
Highways
Department |
603 m2 |
Dekguard
S Coating for Concrete Surface |
| 14 |
Protective
Coating for H189 Flyover |
Highways
Department |
2,000 m2 |
Dekguard
S Coating for Concrete Surface |
| 15 |
Protective
Coating for H210 Flyover |
Highways
Department |
100 m2 |
Dekguard
S Coating for Concrete Surface |
| 16 |
Protective
Coating for H210 Flyover |
Highways
Department |
5,000 m2 |
Dekguard
S Coating for Concrete Surface |
| 17 |
Protective
Coating for HF102 Flyover |
Highways
Department |
682 m2 |
Dekguard
S Coating for Concrete Surface |
| 18 |
Protective
Coating for HF171 Flyover |
Highways
Department |
2,600 m2 |
Dekguard
S Coating for Concrete Surface |
| 19 |
Protective
Coating for K102 Flyover |
Highways
Department |
1,678 m2 |
Dekguard
S Coating for Concrete Surface |
| 20 |
Protective
Coating for K103 Flyover |
Highways
Department |
2,158 m2 |
Dekguard
S Coating for Concrete Surface |
| 21 |
Protective
Coating for K104 Flyover |
Highways
Department |
544 m2 |
Dekguard
S Coating for Concrete Surface |
| 22 |
Protective
Coating for K105 Flyover |
Highways
Department |
504 m2 |
Dekguard
S Coating for Concrete Surface |
| 23 |
Protective
Coating for K106 Flyover |
Highways
Department |
386 m2 |
Dekguard
S Coating for Concrete Surface |
| 24 |
Protective
Coating for K107 Flyover |
Highways
Department |
512 m2 |
Dekguard
S Coating for Concrete Surface |
| 25 |
Protective
Coating for K108 Flyover |
Highways
Department |
598 m2 |
Dekguard
S Coating for Concrete Surface |
| 26 |
Protective
Coating for K109 Flyover |
Highways
Department |
493 m2 |
Dekguard
S Coating for Concrete Surface |
| 27 |
Protective
Coating for K110 Flyover |
Highways
Department |
708,48 m2 |
Dekguard
S Coating for Concrete Surface |
| 28 |
Protective
Coating for K111 Flyover |
Highways
Department |
2893.2 m2 |
Dekguard
S Coating for Concrete Surface |
| 29 |
Protective
Coating for K12 Flyover |
Highways
Department |
5,170 m2 |
Dekguard
S Coating for Concrete Surface |
| 30 |
Protective
Coating for K124 Flyover |
Highways
Department |
1,123 m2 |
Dekguard
S Coating for Concrete Surface |
| 31 |
Protective
Coating for K13 Flyover |
Highways
Department |
3,600 m2 |
Dekguard
S Coating for Concrete Surface |
| 32 |
Protective
Coating for K2 Flyover |
Highways
Department |
1,729.5 m2 |
Dekguard
S Coating for Concrete Surface |
| 33 |
Protective
Coating for K3 Flyover |
Highways
Department |
5,960 m2 |
Dekguard
S Coating for Concrete Surface |
| 34 |
Protective
Coating for K38 Flyover |
Highways
Department |
8,450 m2 |
Dekguard
S Coating for Concrete Surface |
| 35 |
Protective
Coating for K59 Flyover |
Highways
Department |
1221 m2 |
Dekguard
S Coating for Concrete Surface |
| 36 |
Protective
Coating for K80 Flyover |
Highways
Department |
433 m2 |
Dekguard
S Coating for Concrete Surface |
| 37 |
Protective
Coating for K89 Flyover |
Highways
Department |
10,640 m2 |
Dekguard
S Coating for Concrete Surface |
| 38 |
Protective
Coating for KF24 Flyover |
Highways
Department |
198.3 m2 |
Dekguard
S Coating for Concrete Surface |
| 39 |
Protective
Coating for KF27 Flyover |
Highways
Department |
950 m2 |
Dekguard
S Coating for Concrete Surface |
| 40 |
Protective
Coating for KF67 Flyover |
Highways
Department |
440 m2 |
Dekguard
S Coating for Concrete Surface |
| 41 |
Protective
Coating for KU8 Flyover |
Highways
Department |
1,342 m2 |
Dekguard
S Coating for Concrete Surface |
| 42 |
Protective
Coating for KU9, 10 Flyover |
Highways
Department |
3,000 m2 |
Dekguard
S Coating for Concrete Surface |
| 43 |
Protective
Coating for N774 Flyover |
Highways
Department |
310 m2 |
Dekguard
S Coating for Concrete Surface |
| 44 |
Protective
Coating for NF106 Flyover |
Highways
Department |
1,028 m2 |
Dekguard
S Coating for Concrete Surface |
| 45 |
Protective
Coating for NF107 & NF77 Flyover |
Highways
Department |
1,950 m2 |
Dekguard
S Coating for Concrete Surface |
| 46 |
Protective
Coating for NF318 Flyover |
Highways
Department |
543 m2 |
Dekguard
S Coating for Concrete Surface |
| 47 |
Protective
Coating for NF546 Flyover |
Highways
Department |
590 m2 |
Dekguard
S Coating for Concrete Surface |
| 48 |
Protective
Coating for NF546 Flyover |
Highways
Department |
2,807 m2 |
Dekguard
S Coating for Concrete Surface |
| 49 |
Protective
Coating N644,648 Flyover |
Highways
Department |
80 m2 |
Dekguard
S Coating for Concrete Surface |
| 50 |
Winner Bldg
at Hung Hum |
Hop Shing |
|
Dismantle
& Refooring |
| 51 |
Repulse Bay
Garden |
Hop Shing |
|
Dismantle
& Renovation |
| 52 |
Bulter Tower,
1-5 Boyce Road, Jardine Lookout |
JLW Mgt |
|
Dismantle
& Waterproofing |
| 53 |
Hong Kong
Aviation Club |
Hop Shing |
|
Dismantle
for Kitchen |
| 54 |
080 Terminal
Building at CLK |
YEKJV |
15000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 55 |
Cha Kwo Ling
Road Site A Phase 1A |
Sung Foo
Kee |
7000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 56 |
Cheung Sha
Wan Dangerous Goods Godown |
Sung Foo
Kee |
47000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 57 |
China HK
City - Immigration Area |
ASD |
5000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 58 |
China Hong
Kong City Commercial Complex |
Hip Hing |
5000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 59 |
Cyber Port
C3/4 |
Hsin Chong |
35000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 60 |
Eastern District
Hospital |
The Flectcher
Const. Co. Ltd |
1200 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 61 |
Factory Bldg
at Tai Lee Street Tuen Long Lot No. 3780 |
Wah Fai Const.
Co. Ltd. |
8000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 62 |
Fanling Industrial
Building |
Wah Fai Const.
Co. Ltd. |
10000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 63 |
Government
of HKMA Ma On Shan Station Stage 1 Phase 1 |
GEO Works
Contractor |
1500 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 64 |
Gov't Dockyard
at Stonecutter Island |
Hsin Chong |
14000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 65 |
HK Chinese
Women's Club College |
ASD |
1,300 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 66 |
HK University
of Science & Technology B.2 Clear Water Bay |
Sung Foo
Kee |
6000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 67 |
Ho Tung Lao
Workshops & Depot Train Washing Plant, KCR |
Sanfield-Lam
Contractors Ltd. |
1500 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 68 |
Ho Tung Lau
Workshops & Depot |
Sanfield-Lam
Const. Ltd. |
13000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 69 |
Kowloon Bay
N.K.I.L. 5948 |
Wah Fai Const.
Co. Ltd. |
8500 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 70 |
Kwai Chung
Terminal 4 |
Kumagai Gumi |
40000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 71 |
Kwai Chung
Terminal 6 |
Kumagai Gumi |
8000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 72 |
Kwai Fong
Estate 6 |
Hsin Chong |
15000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 73 |
Lam Tin South
Phase 6 |
Hsin Chong |
20000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 74 |
Man Kiu School |
ASD |
800 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 75 |
Methodist
School at Lam Tin |
ASD |
800 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 76 |
Mong Kok
West Phase 1 |
Hsin Chong |
50000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 77 |
Mong Kok
West Phase 2 |
Hsin Chong |
12000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 78 |
New East
Ocean Commercial Building |
Kumagai Gumi |
12000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 79 |
New Island
Printing Fty at Yuen Long |
Hsin Chong |
20000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 80 |
Northern
District Hospital |
Hsin Chong |
50000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 81 |
Park View
Development on IL 1051 Hong Kong |
Construction
Techniques Ltd. |
45000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 82 |
Proposed
Residential at T.W.T.L. 96 Rp & Lot 349 |
Kai Tai Const.
Co. Ltd. |
30000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 83 |
Sheung Fing
Street Joint User Building Diamond Hill Kowloon |
Technic Const.
Co. Ltd. |
8500 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 84 |
Sing Yin
College |
ASD |
1,200 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 85 |
Siu Lam Residential
Building |
Wing Yick
Const. Co. Ltd. |
5000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 86 |
Tan Shui
Kin Indoor Gall Hall |
ASD |
2600 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 87 |
Tin Shui
Wai Area 101 Phase 1 |
Hsin Chong |
20000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 88 |
Tin Shui
Wai Area 102 Phase 6 |
Hsin Chong |
35000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 89 |
Tin Shui
Wai Area 3, Phase 1 & 2 |
Hsin Chong |
700000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 90 |
Tsuen Wan
43-57 Wang Wo Tsai Street Godown |
Kan's Const.
Co. Ltd. |
25000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 91 |
Tuen Mun
213 N.T. |
Wah Fai Const.
Co. Ltd. |
2500 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 92 |
Tuen Mun
232 Site |
Wing Yick
Const. Co. Ltd. |
24000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 93 |
Tuen Mun
4C |
Hsin Chong |
12000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 94 |
Tung Chung
Area 30 Phase 2 |
Hsin Chong |
40000 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 95 |
Wang Tau
Hom Estate (T.P.T.L1.S.F.S/S4) |
Handwoo Const.
Co. Ltd. |
38950 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 96 |
Wesley College |
ASD |
700 m2 |
Floor Coating
(Surfacing / Resurfacing) |
| 97 |
9127 Shanon
House Eastern Hotel |
Sung Foo
Kee |
6000 meter
run |
Joint Sealing |
| 98 |
91-93 Caine
Road |
Kwai Hung
Const. Co. Ltd. |
1500 meter
run |
Joint Sealing |
| 123 |
Alteration
Work on I.L. 29, Hysan Avenue, HK |
Grand Choice
Const. Co. Ltd. |
3000 meter
run |
Joint Sealing |
| 99 |
Bowen Road
Project Hong Kong |
Grand Choice
Const. Co. Ltd. |
3000 meter
run |
Joint Sealing |
| 100 |
Braemer Hill
Road |
Grand Choice
Const. Co. Ltd. |
28000 meter
run |
Joint Sealing |
| 101 |
Cha Kwo Ling
Road Phase 2 Site |
Tak Son Const.
Co. Ltd. |
60000 meter
run |
Joint Sealing |
| 121 |
Chek Lap
Kok Airport Pavement Sealant Replacement |
Airport Authority |
200000 meter
run |
Joint Sealing |
| 102 |
Cheung Sha
Wan Dangerous Goods Godown |
Sung Foo
Kee |
2000 meter
run |
Joint Sealing |
| 103 |
Commercial
& Residential Development Phase 1 on STTL 320 - Tai Wai |
Bold Win
Const. Co. Ltd. |
10000 meter
run |
Joint Sealing |
| 104 |
Evergreen
Hotel Wanchai |
|
5000 meter
run |
Joint Sealing |
| 105 |
Hong Kong
Baptist College |
Sung Foo
Kee |
2000 meter
run |
Joint Sealing |
| 106 |
Joiu Guang
Centre Beijing PRC -China |
Perfect Marble
Co. Ltd. |
8000 meter
run |
Joint Sealing |
| 107 |
Junk Bay
Project - Clearwater Bay |
Grand Choice
Const. Co. Ltd. |
2100 meter
run |
Joint Sealing |
| 108 |
Kimberley
Road Hotel |
Perfect Marble |
550 meter
run |
Joint Sealing |
| 109 |
Kowloon Bay
H.K.I.L. 5948 |
Wah Fai Const.
Co. Ltd. |
9000 meter
run |
Joint Sealing |
| 110 |
Kwai Fong
Estate 6 |
Hsin Chong |
8000 meter
run |
Joint Sealing |
| 111 |
Kwun Tong
Diary Farm New Extension |
Kai Tai Const.
Co. Ltd. |
2300 meter
run |
Joint Sealing |
| 112 |
Lai Shing
Garden Phase 3 Tsuen Wan |
Bold Win
Const. Co. Ltd. |
50000 meter
run |
Joint Sealing |
| 113 |
Leighton
Road I.L. 6362 Telephone Builiding |
Grand Choice
Const. Co. Ltd. |
6000 meter
run |
Joint Sealing |
| 114 |
Lok Fu Phase
7 |
Hsin Chong |
6000 meter
run |
Joint Sealing |
| 115 |
Ma Heng Village
Phase 1 |
Hsin Chong |
5000 meter
run |
Joint Sealing |
| 116 |
Mongkok West
Phase 1 |
Hsin Chong |
22000 meter
run |
Joint Sealing |
| 117 |
Mongkok West
Phase 2 |
Hsin Chong |
12000 meter
run |
Joint Sealing |
| 118 |
N.K.I.L.
5930 Nam Cheong Street |
Ngo Kee Const.
Co. Ltd. |
2600 meter
run |
Joint Sealing |
| 119 |
N0.6 -10
Wong Nei Chung Gap Road |
Tin Wo Const.
Co. Ltd. |
10000 meter
run |
Joint Sealing |
| 120 |
No.8 Robinson
Road Project |
ACME Sanitary
Eng. Co. Ltd. |
5000 meter
run |
Joint Sealing |
| 122 |
Plover Cove
Garden, Tai Po |
Me Cheung
Eng. & Dec. Ltd. |
16000 meter
run |
Joint Sealing |
| 124 |
Proposed
Low Rise Residential House Lot 4270 Tan Kwai Tsuen N.T. |
Shun Fai
Const. Co. Ltd |
10000 meter
run |
Joint Sealing |
| 125 |
PSPS at Tuen
Mun Town Lot 395 Lung Mum Rd Area 18 |
Hsin Chong |
600000 meter
run |
Joint Sealing |
| 126 |
Ritz Carlton
Hotel |
Perfect Marble |
36000 meter
run |
Joint Sealing |
| 127 |
S.T.T.L.
294 Shatin |
E.Man Const.
Co. Ltd. 25,000 < |
25000 meter
run |
Joint Sealing |
| 128 |
Sheung Fung
Lane |
Kwai Hung
Const. Co. Ltd. |
4500 meter
run |
Joint Sealing |
| 129 |
T.W.T.L.
96 & Lot 349 in DD355 Tsuen Wan |
ACME Sanitary
Eng. Co. Ltd. |
20000 meter
run |
Joint Sealing |
| 130 |
Tin Shui
Wai Area 3, Phase 1 & 2 |
Hsin Chong |
30000 meter
run |
Joint Sealing |
| 131 |
Tin Shui
Wai Phase 111 |
Chun Wo |
44000 meter
run |
Joint Sealing |
| 132 |
Town Gas
Bldg at Jeff Road |
Aoki |
5000 meter
run |
Joint Sealing |
| 133 |
Tsing Yi
Area 8 - Ching Tai Court |
SGE BTP Const.
Co. Ltd. |
25000 meter
run |
Joint Sealing |
| 134 |
Tsuen Wan
Industrial Building |
Grade Choice
Co. LTd. |
5000 meter
run |
Joint Sealing |
| 135 |
Tsuen Wan
Lot No. 93 |
Me Cheung
Eng. & Dec. Ltd. |
900 meter
run |
Joint Sealing |
| 136 |
Tuen Mun
296 Site |
Hien Lee
Const. Co. Ltd. |
900 meter
run |
Joint Sealing |
| 137 |
Tuen Mun
4C |
Hsin Chong |
18000 meter
run |
Joint Sealing |
| 138 |
Tung Chung
Area 30 Phase 2 |
Hsin Chong |
24000 meter
run |
Joint Sealing |
| 139 |
Whampoa Garden
Site 11A |
Square Const.
Co. Ltd. |
18500 meter
run |
Joint Sealing |
| 140 |
Whampoa Garden
Site 11B |
Defore Fong
Const. Co. Ltd. |
1700 meter
run |
Joint Sealing |
| 141 |
Whampoa Garden
Site 12 |
Kai Tai Const.
Co. Ltd. |
14000 meter
run |
Joint Sealing |
| 142 |
Whampoa Garden
Site 2 |
Square Const.
Co. Ltd. |
15000 meter
run |
Joint Sealing |
| 143 |
Whampoa Garden
Site 4 |
Kai Tai Const.
Co. Ltd. |
5500 meter
run |
Joint Sealing |
| 144 |
Whampoa Garden
Site 9 Stage 1 and 2 |
Kai Tai Const.
Co. Ltd. |
24000 meter
run |
Joint Sealing |
| 145 |
27 Repulse
Bay Road |
Tysan |
|
Joint Sealing
& Grout Injection |
| 146 |
Government
Flying Service Qtrs (Aircraft Maint - CLK Airport) |
Hsin Chong
|
|
Joint Sealing
& Grout Injection |
| 147 |
91-93 Caine
Road |
Kwai Hung
Const. Co. Ltd. |
140 cu. Meter |
Lightweight
Concrete |
| 148 |
Casueway
Bay I.L. 8584 I.L. 81SQ |
Grand Choice
Const. Co. Ltd. |
50 cu. Meter |
Lightweight
Concrete |
| 149 |
Chai Wan
Safety Godown |
Grand Choice
Const. Co. Ltd. |
600 cu. Meter |
Lightweight
Concrete |
| 150 |
Chai Wan
Wang Chui Estate Phase 3 |
Yiu Wing
Const. Co. Ltd. |
320 cu. Meter |
Lightweight
Concrete |
| 151 |
Craigen Gower
Cricket Club Happy Valley |
Home Kit
Const. Co. Ltd |
395 cu. Meter |
Lightweight
Concrete |
| 152 |
Hung Hom
Estate Phase 2 |
Yiu Wing
Const. Co. Ltd. |
150 cu. Meter |
Lightweight
Concrete |
| 153 |
Nova Cadeia
Centre De Macau |
Companhia
De Eng Da San Sheung Lok |
177 cu. Meter |
Lightweight
Concrete |
| 154 |
Wanchai Government
Bldg. Phase 2 Project |
Square Const.
Co. Ltd. |
250 cu. Meter |
Lightweight
Concrete |
| 155 |
Yuen Long
Industrial Estate |
Junic |
300 cu. Meter |
Lightweight
Concrete |
| 156 |
Hotel Bldg
at CLK Airport |
Chatwin |
|
Misc & Cleaning
Works |
| 157 |
Mcdonald
Road Hong Kong |
Me Cheung
Eng. & Dec. |
|
Misc & Cleaning
Works |
| 158 |
South Park
Road Lot 467 Yuen Long |
Chatwin |
|
Misc & Cleaning
Works |
| 159 |
Hong Kong
Aviation Club |
Hop Shing |
|
Renovation
Works |
| 160 |
Wang Yip
Bldg at Tai Kok Tsui |
Hop Shing |
|
Reroofing
& Waterproofing |
| 161 |
91-93 Caine
Road |
Kwai Hung
Const. Co. Ltd. |
1000 m2 |
Waterproofing |
| 162 |
Albany Road
Project Hong Kong |
Hsin Chong |
500 m2 |
Waterproofing |
| 163 |
Bowen Road
7C |
Home Kit
Const. Co. Ltd |
900 m2 |
Waterproofing |
| 164 |
Clear Water
Bay Silverstrand Project |
Grand Choice
Const. Co. Ltd. |
4500 m2 |
Waterproofing |
| 165 |
Craigen Gower
Cricket Club Happy Valley |
Home Kit
Const. Co. Ltd |
4000 m2 |
Waterproofing |
| 166 |
Cyber Port
C3/4 |
Hsin Chong |
40000 m2 |
Waterproofing |
| 167 |
Fairview
Park B. 15 Yuen Long |
Fuk Shing
Const. Co. Ltd. |
2200 m2 |
Waterproofing |
| 168 |
Fiarview
park B 13 |
Fuk Shing
Const. CO. Ltd. |
2600 m2 |
Waterproofing |
| 169 |
Kennedy Road
Project |
Kwai Hung
Const. Co. Ltd. |
1000 m2 |
Waterproofing |
| 170 |
Mong Kok
West Phase 1 |
Hsin Chong |
25000 m2 |
Waterproofing |
| 171 |
Mongkok West
Phase 2 |
Hsin Chong |
8000 m2 |
Waterproofing |
| 172 |
Park Vale
Quarry Bay Hong Kong |
Lidell Const.
Co. Ltd |
4200 m2 |
Waterproofing |
| 173 |
Sasson Road
Project |
Kai Lam Const.
|
1500 m2 |
Waterproofing |
| 174 |
Sheung Fung
Lane |
Kwai Hung
Const. Co. Ltd. |
1000 m2 |
Waterproofing |
| 175 |
Siu Lam Residential
Building |
Wing Yick
Const. Co. Ltd. |
3000 m2 |
Waterproofing |
| 176 |
Tsing Yi
Area 8 - Ching Tai Court |
SGE BTP Const.
Co. Ltd. |
27000 m2 |
Waterproofing |
| 177 |
Tsing Yi
Power Station |
China Light
& Power Co. Ltd. |
300 m2 |
Waterproofing |
| 178 |
Tsing Yi
Power Station (Contract No. Pep/415085/28664) |
China Light
& Power Co. Ltd. |
500 m2 |
Waterproofing |
| 179 |
Tuen Mun
232 |
Bel Trade |
2500 m2 |
Waterproofing |
| 180 |
TYMCA Kowloon
Redevelopment |
Hsin Chong |
10000 m2 |
Waterproofing |
| 181 |
United Christian
Hospital |
Hsin Chong |
40000 m2 |
Waterproofing |
| 182 |
Yuen Long
Industrial Building |
Wing Yick
Const. Co. Ltd. |
4500 m2 |
Waterproofing |
| 183 |
Yuen Long
Industrial Estate |
Grand Choice
Const. Co. Ltd. |
800 m2 |
Waterproofing |